Good mng,
06/02 14:48 lt vsl arrd to waiting area/ NOR tendered
11/02 21:00 lt NOR re-tendered /anchor aweigh
12/02 13:12 lt vsl arrd to psn/NOR re-tendered
12/02 13:42 – 17:06 lt pilotage to pier no25
12/02 17:48 lt all fast
12/02 17:58 lt gangway ready
12/02 18:00 – 19:00 lt inward clearance
12/02 18:10 – 20:00 lt draft survey
12/02 19:00 – 20:00 lt holds’ inspection
12/02 20:00 lt loading commenced by one gang
13/02 09:00 lt loading by three gangs
15/02 17:20 lt loading completed
15/02 17:20 – 19:00 lt draft survey
15/02 22:18 – 16/02 00:18 lt shifting to anchorage 11A
16/02 05:42 – 06:54 lt shifting to anchorage 11U
16/02 08:42 – 17:40 lt bunkering
16/02 23:40 – 17/02 00:00 lt outward clearance
17/02 01:00 lt the vessel sailed
Cargo loaded abt 57725 mts
04/04 mng Master’s ETA China agw wp