Please see below latest update on the vessel.
06/02 14:48 lt vsl arrd to waiting area/ NOR tendered
11/02 21:00 lt NOR re-tendered /anchor aweigh
12/02 13:12 lt vsl arrd to psn/NOR re-tendered
12/02 13:42 – 17:06 lt pilotage to pier no25
12/02 17:48 lt all fast
12/02 17:58 lt gangway ready
12/02 18:00 – 19:00 lt inward clearance
12/02 18:10 – 20:00 lt draft survey
12/02 19:00 – 20:00 lt holds’ inspection
12/02 20:00 lt loading commenced by one gang
13/02 09:00 lt loading by three gangs
13/02 09:00 lt loaded abt 24700 mts
14/02 late evng ETC loading, ETS agw wp